Removal Procedure
- Disconnect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
in Engine
Electrical.
- Drain the cooling system. Refer to
Cooling System Draining and Filling
.
- Remove the air cleaner assembly. Refer to
Air Cleaner Assembly Replacement
in Engine Controls-3.5L.
- Remove the throttle body. Refer to
Throttle Body Assembly Replacement
in Engine Controls-3.5L.
- Remove the EGR outlet pipe. Refer to
Exhaust Gas Recirculation Pipe Replacement
in Engine
Controls-3.5L.
- If equipped with AIR, remove the bank 2 secondary air injection
shut-off valve and the bracket. Refer to
Secondary Air Injection Shutoff Valve Replacement - Bank 2
in Engine
Controls-3.5L.
- Install the engine support fixture. Refer to
Engine Support Fixture
in Engine Mechanical-3.5L.
- Raise and support the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Remove the transmission filler tube. Refer to
Transmission Fluid Filler Tube Replacement
in Automatic Transaxle - 4T65 - E.
- Remove the catalytic converter. Refer to
Catalytic Converter Replacement
in Engine Exhaust.
- Remove the EGR inlet pipe from the right exhaust manifold. Refer
to
Exhaust Gas Recirculation Pipe Replacement
in Engine Controls-3.5L.
- Remove the frame assembly. Refer to
Frame Replacement
in Frame and Underbody.
- If equipped with AIR,
remove the AIR crossover pipe bolt (3).
- If equipped with AIR, remove the AIR crossover pipe nut.
Important: DO NOT remove the right exhaust manifold from the vehicle.
- Remove the right exhaust manifold from the right cylinder head and the
left exhaust manifold. Position the manifold aside. Refer to
Exhaust Manifold Replacement - Right Side
in Engine Exhaust.
- Lower the vehicle.
- Remove the EGR valve and the EGR heat shield. Refer to
Exhaust Gas Recirculation Valve Replacement
in Engine Controls-3.5L.
- Remove the radiator inlet hose from the coolant crossover. Refer
to
Radiator Inlet Hose Replacement
.
- Remove the heater inlet hose from the coolant crossover. Refer
to
Heater Hoses Replacement
in Heating, Ventilation and Air Conditioning.
- Remove the throttle body coolant hose from the coolant crossover.
- Remove the coolant crossover
bolts (1-6).
- Remove the coolant crossover.
- Remove the coolant crossover gaskets.
- Clean and inspect the coolant crossover gasket mating surfaces.
Installation Procedure
- Install the new coolant crossover gaskets (1).
- Install the coolant crossover.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the coolant crossover bolts (1-6).
Tighten
Tighten the bolts in sequence to 25 N·m (18 lb in).
- Install the throttle body coolant hose to the coolant crossover.
- Install the heater inlet hose to the coolant crossover. Refer
to
Heater Hoses Replacement
in Heating, Ventilation and Air Conditioning.
- Install the radiator inlet hose to the coolant crossover. Refer
to
Radiator Inlet Hose Replacement
.
- Install the EGR heat shield and the EGR valve. Refer to
Exhaust Gas Recirculation Valve Replacement
in Engine Controls-3.5L.
- Raise the vehicle.
- Install the right exhaust manifold to the right cylinder head
and the left exhaust manifold. Refer to
Exhaust Manifold Replacement - Right Side
in Engine Exhaust.
- If equipped with AIR,
install the AIR crossover pipe nut.
Tighten
Tighten the nut to 25 N·m (18 lb ft).
- If equipped with AIR, install the AIR crossover pipe bolt (3).
Tighten
Tighten the bolt to 9 N·m (80 lb in).
- Install the frame assembly. Refer to
Frame Replacement
in Frame and Underbody.
- Install the EGR inlet pipe to the right exhaust manifold. Refer
to
Exhaust Gas Recirculation Pipe Replacement
in Engine Controls-3.5L.
- Install the catalytic converter. Refer to
Catalytic Converter Replacement
in Engine Exhaust.
- Install the transmission filler tube. Refer to
Transmission Fluid Filler Tube Replacement
in Automatic Transaxle-4T65-E.
- Lower the vehicle.
- Remove the engine support fixture.
- If equipped with AIR, install the bank 2 secondary air
injection shut-off valve bracket and the valve. Refer to
Secondary Air Injection Shutoff Valve Replacement - Bank 2
in Engine Controls-3.5L.
- Install the EGR outlet pipe. Refer to
Exhaust Gas Recirculation Pipe Replacement
in Engine
Controls-3.5L.
- Install the throttle body. Refer to
Throttle Body Assembly Replacement
in Engine Controls-3.5L.
- Install the air cleaner assembly. Refer to
Air Cleaner Assembly Replacement
in Engine Controls-3.5L.
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
in Engine
Electrical.
- Fill the cooling system. Refer to
Cooling System Draining and Filling
.
- Inspect the exhaust and the cooling systems for leaks.