Removal Procedure
- Remove the instrument panel. Refer to
Instrument Panel Carrier Replacement
in Instrument, Panel Gauges and Console.
- Remove the 1 screw and remove the center air distributor duct (7).
- Remove 4 defroster air outlet duct screws.
- Remove the defroster air outlet duct (3).
Installation Procedure
- Install the defroster air outlet duct (3). Secure with the 4 screws.
- Install the center air distributor duct (7) and secure with the
1 screw.
- Install the instrument panel. Refer to
Instrument Panel Carrier Replacement
in Instrument Panel, Gauges and Console.