GM Service Manual Online
For 1990-2009 cars only
Makes
🢒
Suzuki
🢒
2009
🢒
XL-7 AWD
🢒
Engine
🢒
Engine Mechanical - 2.8L, 3.0L, 3.2L, or 3.6L
🢒 Positive Crankcase Ventilation Hose/Pipe/Tube Replacement
Positive Crankcase Ventilation Hose/Pipe/Tube Replacement Front
Removal Procedure
Remove the engine cover. Refer to
Fuel Injector Sight Shield Replacement
.
Disconnect the positive crankcase ventilation (PCV) fresh air pipe from the air cleaner duct.
Disconnect the PCV air pipe from the valve cover.
Installation Procedure
Connect the PCV air pipe to the valve cover valve.
Connect the PCV fresh air pipe to the air cleaner duct.
Install the engine cover. Refer to
Fuel Injector Sight Shield Replacement
.
Positive Crankcase Ventilation Hose/Pipe/Tube Replacement Rear
Removal Procedure
Remove the engine cover. Refer to
Fuel Injector Sight Shield Replacement
.
Disconnect the positive crankcase ventilation (PCV) fresh air pipe from the upper intake manifold.
Disconnect the PCV foul air pipe from the PCV valve.
Installation Procedure
Connect the PCV foul air pipe to the PCV valve.
Connect the PCV fresh air pipe to the upper intake manifold.
Install the engine cover. Refer to
Fuel Injector Sight Shield Replacement
.