Cleaning and Inspection Procedure
- Inspect the No.2 rear control valve body (325) for the following conditions:
• | Damaged machined surfaces |
- Clean all the valves, springs, bushings, and the No.2 rear control vale body (325) in solvent.
- Dry all the parts using compressed air.
Installation Procedure
- Install the lock up control valve spring (408).
- Install the lock up control valve (409).
- Install the lock up control valve plunger (410).
- Install the solenoid modulator valve bore plug (411) and the sleeve/bore plug retainer (401).