Removal Procedure
Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.
- Remove all related panels and components.
- Restore as much of the damage as possible to the factory specifications.
- Note the location and remove the following materials, as necessary:
• | The anti-corrosion materials |
Important: Do not damage any of the inner panels or the reinforcements.
- Locate, and drill out all of the factory welds. Note the number and location of the welds for the installation of the service part.
- Remove the damaged quarter filler.
Installation Procedure
Important: In any area with excessive damage, space the plug weld holes every 40 mm (1½ in) apart.
- Drill 8 mm (0.3 in) plug weld holes in the service part as necessary in the locations noted from the original panel.
- Prepare all of the mating surfaces as necessary.
- Apply 3M Weld-Thru Coating P/N 05916 or equivalent to all mating surfaces.
- Position the quarter lower filler.
- Plug weld accordingly.
- Clean and prepare all of the welded surfaces.
- Apply the following products, as necessary:
• | The sound deadening materials |
• | An approved anti-corrosion primer |
• | The sealers and refinish as necessary |
- Install all of the related panels and components.