Step | Action | Yes | No | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
DEFINITION: Noise from the HVAC Module. | |||||||||||||||
1 | Were you sent here from Symptoms - HVAC Systems - Manual? | Go to Step 2 | |||||||||||||
2 |
Is a noise evident? | Go to Step 3 | -- | ||||||||||||
3 | Is a scrape or pop noise evident? | Go to Step 7 | Go to Step 4 | ||||||||||||
4 | Is a tick/click, chirp or groan noise evident? | Go to Step 9 | Go to Step 5 | ||||||||||||
5 | Is an air rush/whistle noise evident? | Go to Step 6 | Go to Step 2 | ||||||||||||
6 | Inspect outlets for proper operation and alignment. Does everything look normal? | Go to Step 13 | Go to Step 17 | ||||||||||||
7 | Is a scrape or pop noise evident when selecting modes? | Go to Step 11 | Go to Step 8 | ||||||||||||
8 | Is a scrape or pop noise evident when selecting temperature settings? | Go to Step 12 | -- | ||||||||||||
9 | Remove the passenger compartment air filter. Refer to Passenger Compartment Air Filter Replacement . Inspect the housing for foreign material and/or obstructions. Was foreign material present? | Go to Step 15 | Go to Step 10 | ||||||||||||
10 | Remove the blower motor. Refer to Blower Motor Replacement . Inspect the motor and housing for obstructions or foreign material. Was foreign material present? | Go to Step 15 | Go to Step 11 | ||||||||||||
11 | Visually inspect the mode doors for proper operation while cycling through the mode settings. Is the linkage properly attached to the mode actuators and doors? | Go to Step 13 | Go to Step 14 | ||||||||||||
12 | Visually inspect the temperature doors for proper operation while cycling through the temperature settings. Is the linkage properly attached to the temperature actuators and doors? | Go to Step 13 | Go to Step 14 | ||||||||||||
13 |
Was foreign material present? | Go to Step 15 | -- | ||||||||||||
14 | Align the linkage to the actuator and the door. Is the repair complete? | Go to Step 19 | -- | ||||||||||||
15 | Remove the obstruction or foreign material. Is the action complete? | Go to Step 15 | -- | ||||||||||||
16 | Align the ducts for proper airflow. Is the action complete? | Go to Step 19 | -- | ||||||||||||
17 | Install the IP Retainer. Is the action complete? | Go to Step 19 | -- | ||||||||||||
18 | Replace the HVAC module. Refer to HVAC Module Assembly Replacement . Is the repair complete? | Go to Step 19 | -- | ||||||||||||
19 | Operate the system to verify the repair. Did you find and correct the condition? | System OK | Go to Step 2 |