Callout | Component Name |
---|---|
Preliminary Procedures
| |
1 | Floor Panel Tunnel Carpet Procedure
|
2 | Floor Panel Tunnel Carpet "Service Only" Fastener ProcedureInstall the supplied fastener approximately 290 mm vertically from the sheet metal floor (carpet pulled back) just in front of tunnel carpet tab. |
Callout | Component Name |
---|---|
Preliminary Procedures
| |
1 | Floor Panel Tunnel Carpet Procedures
|
2 | Floor Panel Tunnel Carpet "Service Only" Fastener ProcedureInstall the modified carpet with the supplied rivets approximately 115 mm (4.5 in) from the driver side cowl and 300 mm (11.8 in) up from the driver side floor pan sheet metal. |