Callout | Component Name |
---|---|
Preliminary Procedure
Important: Pull the tie bar far enough back for the air distribution duct to clear the opening. | |
1 | Nut, Distributor Air (Qty: 4) Notice: Refer to Fastener Notice in the Preface section. Tighten |
2 | Bolt, Distributor Air Tighten |
3 | Distributor, Air |