GM Service Manual Online
For 1990-2009 cars only

Release Bearing Replacement Y4M

Tools Required

    • DT 47513 (DW 210-030) Bushing Joint Pipe
    • DT 47514 (DW 210-040) Bushing Remover/Installer
    • J 2619-01 (09930-30102) Slide Hammer
    • 09943-88211 Bushing, Bearing Installer
    • 09923 46040 Bushing Joint Pipe

Removal Procedure

  1. Remove the transaxle from the vehicle. Refer to Transmission Replacement for the Y4M transmission.
  2. Remove the release arm. Refer to Clutch Release Arm Replacement .

  3. Object Number: 1223260  Size: SH
  4. Remove the release bearing.
  5. Remove the No. 2 bushing and seal using DT 47514  (2) and a hammer.
  6. Remove the release shaft (1).

  7. Object Number: 1223269  Size: SH
  8. Insert the tap (M14X1.5) to the No. 1 bushing (1).

  9. Object Number: 1223268  Size: SH
  10. Insert DT 47514  (1) into the tab.
  11. Connect J 2619-01  (2) to the end of DT 47513 .
  12. Remove the No. 1 bushing by pulling.

Installation Procedure


    Object Number: 1223276  Size: SH
  1. Install the No. 1 release shaft bushing using 09923 46040  (1) , DT 47513  (2), and a hammer.

  2. Object Number: 1223274  Size: SH
  3. Install the No. 2 release shaft bushing and seal using DT 47514  (1) and a hammer.

  4. Object Number: 1223272  Size: SH
  5. Coat the spline of the transaxle input shaft with multi-purpose grease (1).
  6. Coat the release bearing bore and the connecting of the release shaft with multi-purpose grease (2).
  7. Install the release bearing.
  8. Install the release arm. Refer to Clutch Release Arm Replacement .
  9. Install the transaxle to the vehicle. Refer to Transmission Replacement for the Y4M transmission.