Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you review the starting system operation and perform the necessary inspections? | -- | Go to Symptoms | |
2 | Verify that the starter solenoid does not click. Does the starter solenoid operate properly? | -- | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | |
3 |
Is the voltage greater than the specified value? | 9.5 V | ||
4 |
Is the voltage greater than the specified value? | 9.5 V | ||
5 | Test for voltage at the STARTER relay socket cavity 85 to ground. Is the voltage greater than the specified value? | 9.5 V | ||
6 | Test for voltage between the STARTER relay socket cavity 85 and cavity 86. Is the voltage greater than the specified value? | 9.5 V | ||
7 |
Is the voltage greater than the specified value? | 9.5 V | ||
8 | Is the vehicle equipped with a manual transmission? | -- | ||
9 |
Is the voltage greater than the specified value? | 9.5 V | ||
10 |
Does the engine crank? | -- | ||
11 |
Is the voltage greater than the specified value? | 9.5 V | ||
12 |
Does the engine crank? | -- | ||
13 |
Is the voltage greater than the specified value? | 9.5 V | ||
14 | Measure the voltage between the ignition switch C211 connector D5 and ground. Is the voltage greater than the specified value? | 9.5 V | ||
15 |
Does the engine crank? | -- | ||
16 | Replace the starter. Refer to Starter Motor Replacement . Is the repair complete? | -- | -- | |
17 | Repair the open in CKT 19 (RED) between the battery Fuse B stud and the STARTER relay Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
18 | Repair the open in CKT 6 (PPL) between the STARTER relay and the starter solenoid Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
19 | Repair the open in CKT 350 (BLK) between the STARTER relay and G102 Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
20 | Replace the STARTER relay. Is the replacement complete? | -- | -- | |
21 |
Does the engine crank? | -- | ||
22 | Replace the manual transmission clutch starter switch Refer to Clutch Pedal Engine Start Switch Replacement in Transmission Clutch. Is the repair complete? | -- | -- | |
23 | Repair the open in CKT 1035 (PPL) between the manual transmission clutch start switch and the STARTER relay Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
24 | Replace the Park/Neutral Position and Backup Lamp Switch. Refer to Park/Neutral Position Switch Replacement in Automatic Transmission. Is the replacement complete? | -- | -- | |
25 | Repair the open in CKT 1035 (PPL) between the Park/Neutral Position and Backup Lamp Switch and the STARTER relay Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
26 | Inspect for an open in CKT 5 (YEL) between the ignition switch and the underhood fuse block. Is an open present in CKT 5 (YEL)? | -- | ||
27 | Repair the open in CKT 5 (YEL) between the ignition switch and the underhood fuse block Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
28 | Repair the open in CKT 806 (PPL) between the underhood fuse block and the manual transmission clutch start switch (M/T) or the Park/Neutral Position and Backup Lamp Switch (A/T) Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
29 | Replace the ignition switch. Refer to Ignition Coil and Ignition Coil Module Replacement . Is the repair complete? | -- | -- | |
30 | Repair the open in CKT 740 (ORN) between the ignition switch and the underhood fuse block Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
31 | Operate the system in order to verify the repair. Did you correct the condition? | -- | System OK |