- Block the vehicle wheels.
- Drain all of the air reservoirs. Refer to
Draining Reservoirs
- Remove the double check
valve.
- Plug the delivery port.
- Connect an air supply to one of the supply ports. Apply approximately
861 kPa (125 psi) of air pressure.
- Apply a soap solution to the opposite supply port.
- Check that the leakage is less than a 25 mm (1 inch)
bubble in 5 seconds. If the leakage exceeds these specifications, repair or
replace the valve.
- Disconnect the air supply and repeat steps 4 through 6 on the
other supply port.
- Shut off and disconnect the air supply.
- Unplug the delivery port.
- Install the double check valve.
- Start the engine.
- Charge the air supply system to the air compressor governor cut-out
point.
- Stop the engine.
- Check for proper brake operation.
- Remove the wheel blocks.