- Apply the parking brake and block the vehicle wheels.
- Start the engine and charge the system to the air compressor governor
check-out point.
- Turn off the engine.
- Drain the air pressure from the supply reservoir. Refer to
Draining Reservoirs
.
- Disconnect the air line
on the supply side of the single check valve.
- Inspect the single check valve for any air leakage. The air leakage
must not exceed a 25.4 mm (1 in) bubble in 5 seconds.
If the leakage is excessive, overhaul or replace the single check valve.
- Connect the supply port air line.
- Start the engine and charge the air system to the governor cut-out
point.
- Connect the supply port air line.
- Start the engine and charge the air system to the governor cut-out
point.
- Stop the engine.
- Check the brake operation.
- Remove the wheel blocks.