Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Power Door Locks System Check performed? | -- | Go to Step 2 | |
2 |
Is continuity present? | -- | Go to Step 5 | Go to Step 3 |
3 |
Is continuity present? | -- | Go to Step 4 | Go to Step 6 |
4 |
Does the test lamp light? | -- | Go to Step 7 | Go to Step 8 |
5 | Replace the power door lock control module. Is the repair complete? | -- | -- | |
6 | Repair the open in CKT 150 (BLK) between the side door jamb switch and ground G402 or ground G200 (with upfitter). Refer to Wiring Repairs . Is the repair complete? | -- | -- | |
7 | Replace the side door jamb switch. Refer to Sliding Door Jamb Contact Plate Replacement . Is the repair complete? | -- | -- | |
8 | Repair the open in CKT 158 (WHT/BLK) between the power door lock control module and the side door jamb switch. Refer to Wiring Repairs . Is the repair complete? | -- | -- |