Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Power Windows System Check performed? | -- | Go to Step 2 | |
2 | Check condition of the PWR WDO fuse. Is PWR WDO fuse open? | -- | Go to Step 5 | Go to Step 3 |
3 |
Is continuity present? | -- | Go to Step 4 | Go to Step 6 |
4 |
Does the test lamp light? | -- | Go to Step 7 | Go to Step 8 |
5 | Repair the short to ground in CKT 343 (YEL) between the IP fuse block and the left front or right front door power side window switch. Refer to Wiring Repairs . Is the repair complete? | -- | -- | |
6 | Repair the open in CKT 150 (BLK) between the left front door power side window switch and ground G201. Refer to Wiring Repairs . Is the repair complete? | -- | -- | |
7 | Replace the left front door power side window switch. Refer to Front Side Door Window Switch Replacement . Is the repair complete? | -- | -- | |
8 | Repair the open in CKT 343 (YEL) between the IP fuse block and splice S229. Refer to Wiring Repairs . Is the repair complete? | -- | -- |