Notice: Proper lower intake manifold fastener tightening sequence
and torque is critical. Always follow the tightening sequence, and torque
the intake manifold bolts using the 3 step method. Failing to do so may distort
the crankshaft bearing bore alignment and cause damage to the crankshaft bearings.
- Install the lower intake manifold. Refer to Intake Manifold Installation
.
- Connect the EVAP canister
purge solenoid valve pipe.
- Install the ICM. Refer to
Ignition Coil and Ignition Coil Module Replacement
in Engine Electrical.
- Install the fuel supply and return pipes to the rear of the intake
manifold. Refer to
Fuel Hose/Pipes Replacement - Engine Compartment
in Engine
Controls.
- Install the PCV valve
hose to valve rocker arm cover and the valve rocker arm cover.
- Connect the A/C vacuum
hose to the intake manifold, if equipped with A/C.
- Connect the vacuum brake booster hose to the intake manifold.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the vacuum
brake booster hose bracket and nut to the intake manifold stud.
Tighten
Tighten the bracket nut to 11 N·m (97 lb in).
- Install the exhaust gas
recirculation (EGR) valve inlet pipe to the intake manifold and the exhaust
manifold.
Tighten
• | Tighten the EGR valve inlet pipe intake manifold nut to 25 N·m
(18 lb ft). |
• | Tighten the EGR valve inlet pipe clamp bolt to 25 N·m
(18 lb ft). |
• | Tighten the EGR valve inlet pipe exhaust manifold nut to 30 N·m
(22 lb ft). |
Important: In order to install the distributor for the correct engine timing, position
the engine to number one cylinder top dead center.
- Remove the spark plug for number one cylinder.
- Rotate the crankshaft until number one cylinder is in the compression
stroke.
- Align the two reference marks on the crankshaft balancer (1) and
(4) with the two alignment marks (2) and (3) on the front cover.
- Install the spark plug. Refer to
Spark Plug Replacement
in Engine Electrical.
- Install the distributor. Refer to
Distributor Replacement
in Engine Electrical.
- Reposition the power steering
pump mounting bracket.
- Install the three bolts and the nut for the power steering pump
mounting bracket.
- Install the front nut for the power steering pump rear bracket
Tighten
Tighten the power steering pump mounting bracket bolts, the nut, and
the power steering pump rear bracket nuts to 41 N·m (30 lb ft).
- Install the drive belt. Refer to
Drive Belt Replacement
.
- Install the ground wire to the water outlet stud.
Tighten
Tighten the nut to 10 N·m (88 lb in).
- Connect the following electrical connectors:
• | The fuel meter body assembly |
• | The EVAP canister purge solenoid valve |
• | The idle air control (IAC) motor |
• | The throttle position (TP) sensor |
• | The manifold absolute pressure (MAP) sensor |
• | The A/C compressor high pressure switch |
• | The exhaust gas recirculation (EGR) valve |
• | The engine coolant temperature (ECT) sensor |
- Install the accelerator
control cable bracket, bolts, and nuts to the intake manifold and the throttle
body.
Tighten
Tighten the nuts and bolts to 12 N·m (106 lb in).
- Install the accelerator control cable to the throttle shaft. Refer
to
Accelerator Control Cable Replacement
in Engine Controls.
- Install the cruise control cable, if equipped. Refer to
Cruise Control Cable Replacement
in Cruise Control.
- Install the water inlet
hose to the intake manifold.
- Install the heater hoses. Refer to
Heater Hoses Replacement
in Heating and Ventilation (Non-A/C).
- Install the generator. Refer to
Generator Replacement
in Engine Electrical.
- Install the radiator inlet hose to the water outlet. Refer to
Radiator Hose Replacement
in Engine
Cooling.
- Refill the cooling system. Refer to
Cooling System Draining and Filling
in Engine Cooling.
- Install air inlet duct
to the throttle body.
- Connect the PCV tube.
- Install the upper fan shroud section. Refer to
Fan Shroud Replacement
in Engine Cooling.
- Connect the battery negative cable. Refer to
Battery Cable Replacement
in Engine Electrical.
- Install the engine cover. Refer to
Engine Cover Replacement
in Interior Trim.