Removal Procedure
- Remove the pivot pin (2) from the bowl
assembly.
- Remove the shift lever (3) from the bowl assembly.
Ensure that you do not lose the spring (5) or the insulator (6).
- Remove the insulator (6) from the shift lever (3).
- Remove the spring (5).
Installation Procedure
Use a shim as a guide if you experience problems while installing the
shift lever over the spring.
- Install the spring (5).
- Install the shim over the top of the spring.
- Install the insulator (6).
- Install the shift lever (3).
- Install the pivot pin (2).
- Remove the shim.
- Ensure that the shift lever positively engages the shift gate
in all positions.