Cylinder Head Replacement Left
Removal Procedure
Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing
any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to
the vehicle or its components.
- Disconnect
the battery negative cable.
- Drain the cooling system. Refer to
Cooling System Draining and Filling
in Engine Cooling.
- Remove the lower intake manifold. Refer to
Intake Manifold Replacement
.
- Remove the valve rocker arms and valve pushrods. Refer to
Valve Rocker Arm and Push Rod Replacement
.
- Remove the exhaust manifold. Refer to
Exhaust Manifold Replacement
.
- Remove the sixteen cylinder
head bolts.
- Remove the cylinder head and the gasket. Refer to Cylinder Head Removal (Right)
.
- Clean all sealing surfaces. Refer to Cylinder Head Clean and Inspect
.
Installation Procedure
Tools Required
J 36660-A Torque Angle
Meter
- Install the cylinder head.
Refer to Cylinder Head Installation (Right)
.
- Install the exhaust manifold. Refer to
Exhaust Manifold Replacement
.
- Install the valve rocker arms and the valve pushrods.
Refer to
Valve Rocker Arm and Push Rod Replacement
.
- Install the lower intake manifold. Refer to
Intake Manifold Replacement
.
- Fill the cooling system. Refer to
Cooling System Draining and Filling
in Engine Cooling.
- Connect the battery negative cable. Refer to
Battery Cable Replacement
in Engine Electrical.
Cylinder Head Replacement Right
Removal Procedure
Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing
any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to
the vehicle or its components.
- Disconnect
the battery negative cable.
- Drain the cooling system. Refer to
Cooling System Draining and Filling
in Engine Cooling.
- Remove the lower intake manifold. Refer to
Intake Manifold Replacement
.
- Remove the valve rocker arms and valve pushrods. Refer to
Valve Rocker Arm and Push Rod Replacement
.
- Remove the exhaust manifold. Refer to
Exhaust Manifold Replacement
.
- Remove the generator.
Refer to
Generator Replacement
in Engine Electrical.
- Remove the generator and drive belt tensioner bracket using the
following procedure:
7.2. | Remove the three bolts. |
7.3. | Slide the generator and drive belt tensioner bracket off of the
stud. |
- Remove the sixteen cylinder
head bolts.
- Remove the cylinder head and the gasket. Refer to Cylinder Head Removal (Right)
.
- Clean all sealing surfaces. Refer to Cylinder Head Clean and Inspect
.
Installation Procedure
Tools Required
J 36660-A Torque Angle
Meter
- Install the cylinder head.
Refer to Cylinder Head Installation (Right)
.
- Install the generator
and drive belt tensioner bracket using the following procedure:
Tighten
Tighten the stud to 22 N·m (16 lb ft).
• | Loosely assemble the generator and drive belt tensioner bracket
over the stud. |
• | Install a nut to the stud finger tight. |
• | Install the three bolts finger tight. |
Tighten
Tighten the nuts and bolts to 44 N·m (32 lb ft).
- Install the exhaust manifold. Refer to
Exhaust Manifold Replacement
.
- Install the valve rocker arms and the valve pushrods.
Refer to
Valve Rocker Arm and Push Rod Replacement
.
- Install the lower intake manifold. Refer to
Intake Manifold Replacement
.
- Fill the cooling system. Refer to
Cooling System Draining and Filling
in Engine Cooling.
- Connect the battery negative cable. Refer to
Battery Cable Replacement
in Engine Electrical.