Step | Action | Yes | No | ||||
---|---|---|---|---|---|---|---|
Schematic Reference: Interior Lights Schematics | |||||||
1 | Did you review the Lighting System Description and Operation and perform the necessary inspections? | Go to Step 2 | |||||
2 | Verify that the back up lamps are inoperative. Does the system operate normally? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 | ||||
3 |
Does the test lamp illuminate? | Go to Step 5 | Go to Step 4 | ||||
4 |
Does the test lamp illuminate? | Go to Step 7 | Go to Step 6 | ||||
5 | Repair the open in the battery positive voltage circuit between the SP258, C2 and the park/neutral position switch connector. Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | Go to Step 17 | -- | ||||
6 | Repair the open in the battery positive voltage circuit between the SP258, C2 and the backup lamp switch connector cavity 2. Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | Go to Step 17 | Go to Step 8 | ||||
7 | Repair the open in the battery positive voltage circuit between cavity C1 of SP258 and cavity 9 of connector C2 of junction block 2. Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | Go to Step 17 | -- | ||||
8 | With the park/neutral position switch connector still disconnected;
Did you find any high resistance in the circuit? | Go to Step 14 | Go to Step 9 | ||||
9 | With the park/neutral position switch connector still disconnected;
Did you find any high resistance in the circuit? | Go to Step 11 | Go to Step 10 | ||||
10 | Replace the park/neutral position switch. Refer to Park/Neutral Position Switch Replacement in Automatic Transmission. Is the replacement complete? | Go to Step 17 | -- | ||||
11 | Test for open between cavity 9 of connector C3 of junction block 1 and connector cavities:
Is an open condition present? | Go to Step 13 | Go to Step 12 | ||||
12 | Replace the backup lamp switch. Is the replacement complete? | Go to Step 17 | -- | ||||
13 | Test for an open between cavity 9 of connector C3 of junction block 1 and connector cavity 1 of the backup lamp switch. Is an open condition present? | Go to Step 15 | Go to Step 16 | ||||
14 | Repair the open in the backup lamp supply voltage circuit between cavity 9 of connector C3 of junction block 1 and the park/neutral position switch (PNP) connector. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | Go to Step 17 | -- | ||||
15 | Repair the open in the backup lamp supply voltage circuit between cavity 9 of connector C3 of junction block 1 and cavity 1 of the backup lamp switch. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | Go to Step 17 | -- | ||||
16 | Repair the open in the backup lamp supply voltage circuit between the junction block 1, connector C3 cavity 9 and SP450. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | Go to Step 17 | -- | ||||
17 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 3 |