Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Has the Lumbar Support System Check been performed? | -- | Go to Step 2 | |
2 |
Is voltage present? | -- | Go to Step 3 | Go to Step 9 |
3 |
Is voltage present? | -- | Go to Step 4 | Go to Step 10 |
4 |
Is voltage present? | -- | Go to Step 5 | Go to Step 10 |
5 |
Is there continuity? | -- | Go to Step 6 | Go to Step 11 |
6 |
Is voltage present? | -- | Go to Step 7 | Go to Step 12 |
7 |
Is voltage present? | -- | Go to Step 8 | Go to Step 13 |
8 | Replace the lumbar support motor and solenoid assembly. Refer to Lumbar Pump Replacement . Is the repair complete? | -- | -- | |
9 | Repair open in CKT 640 (ORN), w/o heated seats, or CKT 540 (ORN), w/heated seats between lumbar support switch and I/P fuse block. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
10 | Replace the lumbar support switch. Refer to the appropriate procedure: Is the repair complete? | -- | -- | |
11 | Repair open in CKT 150 (BLK) between the lumbar support motor and solenoid assembly and G202. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
12 | Repair open in CKT 767 (RED) between lumbar support switch and lumbar support motor and solenoid assembly. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
13 | Repair open in CKT 768 (GRY) between lumbar support switch and lumbar support motor and solenoid assembly. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- |