- Align the air distribution
duct to the IP.
- Install the lower and driver side air distribution duct bolts.
Tighten
Tighten the lower and driver side air distribution duct bolts to 2.2 N·m
(19 lb in).
- Install the IP carrier to the vehicle.
- Route the harness headlamp branch through the IP opening.
- Connect the harness rosebud (2) to the IP.
- Place the IP harness over the retaining clips (1).
- Connect the IP cluster connector to the IP.
- Route the harness branches
through the IP openings.
- Connect the theft deterrent relay (4) to the SIR bracket.
- Connect the convertible top motor relay (3), if equipped
to the SIR bracket.
- Connect the harness rosebuds (1,2) to the IP.
- Connect the rosebud connectors (3)
to the IP tie bar.
- Connect the convertible top relay (2), if equipped to the
SIR bracket.
- Connect the rear fog lamp relay (1), if equipped to the
SIR bracket.
- Clip the A/C resistor
connector to the IP.
- Connect the IP harness to the A/C resistor connector.
- Connect the blower motor
relay to the IP.
- Connect the hatch release
relay to the IP.
- Install the 48-way connector
and bolts to the IP.
Tighten
Tighten the 48-way connector bolts to 1.5 N·m (11 lb in).
- Route the cross car harness (2)
and forward lamp harness (1) over the hook.
- Install the upper bolts
to the air distribution duct.
Tighten
Tighten the air distribution duct bolts to 2.2 N·m (19 lb in).
- Align the IP carrier to
the dash, with the outboard slots in the IP tie bar over the studs on the
IP mounting brackets at the front body hinge pillar inner panel.
- Press the IP forward and engage the slots in the tie bar onto
the studs on the steering column mounting bracket.
- Align the holes in the IP carrier and the passenger side SIR bracket
to the J-nuts on the dash.
- Install the IP carrier mounting bolts (1).
Tighten
Tighten the IP carrier mounting bolts (1) to 2 N·m
(18 lb in).
- Align the cross car and the IP harness ground to the appropriate
IP mounting studs.
- Install the IP carrier mounting nuts (2).
Tighten
Tighten the IP carrier mounting nuts (2) to 2.5 N·m
(22 lb in).
- Clip the star connector
to the knee bolster bracket.
- Install a tie strap securing the steering column harness branch
to the air distributor duct.
- Align the data link connector
to the tie bar (1).
- Install the data link connector bolts (2).
Tighten
Tighten the data link connector bolts (2) to 2 N·m
(18 lb in).
- Install upper tabs on
the fuse block into the IP carrier.
- Install the fuse block mounting bolt.
Tighten
Tighten the fuse block mounting bolt to 1.5 N·m (13 lb in).
- Install the front floor console. Refer to
Front Floor Console Replacement
.
- Connect the DRL module
electrical connectors.
- Install the DRL module
to the HVAC duct.
- Install the HVAC control. Refer to
Control Assembly Replacement
in HVAC Systems - Manual.
- Pull the harness through
the IP opening.
- Install the retainer (1) to the switch (2).
- Snap the retainer (1) to the IP.
- Install the temperature
control cable to the module.
- Install the temperature control cable bolt.
Tighten
Tighten the temperature control cable bolt to 2.2 N·m (19 lb in).
- On the Pontiac, perform
the following steps:
43.1. | Connect the dimmer switch connector (3) to the headlamp
switch (2). |
43.2. | Connect the headlamp switch connector (1) to the headlamp
switch (2). |
43.3. | Snap the headlamp switch (2) to the IP. |
- On a Chevrolet, perform
the following steps:
44.1. | Connect the dimmer switch connector (5) to the headlamp
switch (4). |
44.2. | Connect the headlamp switch connector (1) to the headlamp
switch (4). |
44.3. | Install the headlamp switch bolts. |
Tighten
Tighten the headlamp switch bolts to 2 N·m (18 lb in).
44.4. | Install the left hand IP accessory trim plate (3). |
- Install the IP cluster. Refer to
Instrument Cluster Replacement
.
- Install the radio. Refer to
Radio Replacement
in Entertainment.
- Install the stoplamp switch. Refer to
Stop Lamp Switch Replacement
in Hydraulic Brakes.
- Enable the SIR system. Refer to
Enabling the SIR System
in Restraints.
- Install the IP storage compartment door. Refer to
Instrument Panel Compartment Door Replacement
.
- Install the knee bolster deflector. Refer to
Knee Bolster Deflector Replacement - Left Side
.
- Install the IP upper trim pad. Refer to
Instrument Panel Upper Trim Pad Replacement
.
- Install the T-tops, if equipped.
- Install the IP insulators. Refer to
Instrument Panel Insulator Panel Replacement - Right Side
and
Instrument Panel Insulator Panel Replacement - Left Side
.