Removal Procedure
Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.
- Disable the SIR system. Refer to
SIR Disabling and Enabling .
- Disconnect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection .
Caution: Sectioning should be performed only in the recommended areas. Failure to do
so may compromise the structural integrity of the vehicle and cause personal injury
if the vehicle is in a collision.
- Remove all related panels and components.
- Restore as much of the damage as possible.
- Remove the sealers and anti-corrosion materials from the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair .
Important: Do not damage any inner panels or reinforcements.
- Apply a piece of 20 mm (3/4 in) tape (2) along the flat area above the outer wheel housing as shown. This is your sectioning location.
- In the rocker panel area, mark a vertical line in the flat area rearward of the triangle shaped opening as shown (1). This is your sectioning location.
- Cut the panel where sectioning is to be performed.
Important: Note the number and location of the factory welds for installation of the quarter panel.
- Locate, mark, and drill out all the necessary factory welds.
- Remove the damaged wheelhouse section.
Installation Procedure
- Cut the service part in the corresponding locations to the sectioning cuts. Allow for a 25 mm (1 in) overlap to the vehicle.
- In the door opening location notch as shown.
- Drill 8 mm (5/16 in) plug weld holes along the sectioning cut on the original reinforcement. Locate these holes 13 mm (½ in) from the edge and spaced 40 mm (1½ in) apart.
Important: If the location of the original plug weld holes can not be determined, or if structural weld-thru adhesive is present, space the plug weld holes every 40 mm (1½ in).
- Drill 8 mm (5/16 in) plug weld holes in the service reinforcement, as necessary, in the locations noted from the original panel.
- Prepare all mating surfaces, as necessary.
- Apply 3M Weld-Thru Coating P/N 05913 or equivalent to all mating surfaces.
- Align the service part on the vehicle using 3-dimensional measuring equipment.
- Plug weld accordingly.
- To create a solid weld with minimum heat distortion, make 25 mm (1 in) stitch welds along the seam with 25 mm (1 in) gaps between them. Go back and complete the stitch weld.
- Clean and prepare all of the welded surfaces.
- Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair .
- Paint the repaired area. Refer to
Basecoat/Clearcoat Paint Systems .
- Install all of the related panels and components.
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection .
- Enable the SIR system. Refer to
SIR Disabling and Enabling .