Callout | Component Name |
---|---|
Preliminary ProcedureRemove the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement. | |
1 | Clamp (Qty: 2) Notice: Refer to Fastener Notice in the Preface section. Tighten |
2 | Air Cleaner Duct ProcedureAlign the air cleaner duct with the PCV vent tube during installation. |
Callout | Component Name |
---|---|
Preliminary ProcedureRemove the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement. | |
1 | Clamp (Qty: 2) Notice: Refer to Fastener Notice in the Preface section. Tighten |
2 | Air Cleaner Duct ProcedureAlign the air cleaner duct with the PCV vent tube during installation. |